Karachaganak Expansion Project
The Karachaganak Expansion Project (KEP) is aimed at managing the increasing Gas/Oil Ratio of the Karachaganak reservoir fluid with time and capturing the value in the gas reserves through the optimisation and extension of the oil production plateau.
Gleeds remit was to undertake a Pre-FEED (Front End Engineering Design) estimate for the proposed new infrastructure.
Cliente:
URS
Localización:
Kazakhstan
Fecha de finalización:
Dec 2014
Valor:
Dave Corbin
Senior Director & Head of Client Accounts
- dave.corbin@gleeds.com
- +44 (0) 7795 685 476